1°)STOPKiT preparation |
- Joining STOPKiT
- Place the patch in the middle of the strap |
Material:
- Torque ratchet 6 to 8 parts
- Recycling bin
Control:
- Fat on the screws, washers
- Diameter of the tube
- Orientation head screws |
| |
|
 |
2°) Preparing the pipe |
- Place the two witnesses
at both ends of the repair |
Material:
- 2 metal Témoins 3X
- Formwork
Control:
- Position of witnesses |
| |
|
 |
3°) Assembly on the pipe |
- Place the patch in the vicinity of the leak
- Tighten allowing freedom of movement |
Material:
- Torque ratchet 6 to 8 parts
Control:
- Center the patch on the strap |
| |
|
 |
4°) Stopping the leak |
- Drag the markers to STOPKiT
- Screw alternately
- Keep the patch centered |
Material:
- Protection PPE
- Key ratchet 8
Control:
- Centering the patch on the leak on the strap |
| |
|
 |
5°) Optimal clamping |
- Tighten to 40N / m
- Tighten the nuts anti vibration
- Check the tightening 40N / m after 8 am |
Material:
- Torque wrench
- Wrench 17
Control:
- No Leakage
- Complete tracking sheet |
|
|
| |
 |
6°) STOPKiT PERMANENT installation |
- Install the shell
- Fill with resin 3X |
Material:
- 3X kit special
Control:
- Refer to specific procedure |
| |
|